Resources / Cost benchmarks / Medical Clinic Construction
GTA construction cost · 2026

Medical clinic construction cost per sq ft in Toronto

Medical clinics and treatment centres in the Greater Toronto Area, hard cost only.

2026 GTA range$460–$800per sq ft, hard cost

Short answer (November 2026): Medical clinic construction in the GTA costs $460–$800 per sq ft in hard costs, before soft costs, contingency and HST (Altus Group 2026 Canadian Cost Guide). For example, a medical clinic or treatment centre of 30,000 sq ft comes to $13.8M – $24.0M in hard cost.

Worked example

A medical clinic or treatment centre of 30,000 sq ft

Hard cost (30,000 × $460–$800)$13.8M – $24.0M
Soft costs at 20%$2.8M – $4.8M
Contingency at 10%$1.7M – $2.9M
Indicative total$18.2M – $31.7M

Included: the building above grade, including foundations.
Not included: GST/HST, site development, parking, land and financing. Soft costs and contingency above are illustrative assumptions; change them in the calculator.

Source: Altus Group, 2026 Canadian Cost Guide (GTA hard costs, CAD per sq ft), used with permission. Ranges are indicative; your site, scope and procurement route will move the number. See all 17 building types →

What drives clinic cost and permit timing: our medical clinic cost guide.