BRC Academy / Scheduling & Tools

Primavera P6

Oracle Primavera P6 from the EPS to a time impact analysis: beginner, intermediate and advanced.

21 sessionsBeginner → IntermediateEach with a worked example, quiz and references

Beginner Sessions 1–20

  1. 1P6 Professional vs P6 EPPM vs Primavera Cloud (Version 26)P6 Professional, P6 EPPM and Oracle Primavera Cloud explained for owners: desktop vs web, standalone vs cloud, XER vs XML, and which set-up to choose.
  2. 2P6 Professional interface tour and navigationA tour of the Primavera P6 Professional screen: menus, toolbars, the Activities window, layouts, filters, F9 and the data date, for owners.
  3. 3EPS and OBS in Primavera P6How the EPS and OBS work in Oracle Primavera P6, how they control access, and how an owner should set them up, with a worked Northgate example.
  4. 4Create a project and project settingsThe P6 Create a New Project wizard, the Project Details tabs and Schedule Options, and how an owner records a contractor baseline's settings.
  5. 5Calendars: global, project, resourceHow P6 global, project and resource calendars work, which one sets an activity's dates, and how an owner checks Ontario holidays in a baseline.
  6. 6WBS in P6How the work breakdown structure works in Oracle Primavera P6 Professional, how to build it, and how an owner should specify and check it.
  7. 7Activity types: Task, LOE, WBS summary, milestonesThe six activity types in Oracle Primavera P6, how each one calculates its dates, and what an owner should check in a contractor's schedule.
  8. 8Durations and duration typesHow Primavera P6 stores durations, the four duration fields, and what each of the four duration types recalculates, with owner checks.
  9. 9Relationships and lagsThe four relationship types in Primavera P6, lags and the lag calendar, driving relationships, and the logic checks an owner should run.
  10. 10Scheduling (F9) and the schedule logWhat F9 does in Primavera P6, the Schedule dialog and Schedule Options, and how an owner reads the schedule log to find logic problems.
  11. 11Critical path vs longest pathWhy Primavera P6's total float and longest path definitions of critical can disagree, how to show both, and what an owner should specify.
  12. 12Total float and free floatTotal float and free float in Primavera P6: how each is calculated, the settings that change them, negative float, and how owners use them.
  13. 13ConstraintsThe nine constraint types in Oracle Primavera P6, which dates each one moves, and how an owner stops constraints hiding delay.
  14. 14Retained logic vs progress overrideHow Primavera P6 schedules out-of-sequence progress under Retained Logic, Progress Override and Actual Dates, and which one an owner should require.
  15. 15Activity codesHow activity codes in Oracle Primavera P6 classify work beyond the WBS: global, EPS and project codes, assigning values, and an owner's code spec.
  16. 16LayoutsWhat a layout stores in Oracle Primavera P6, global, user and project layouts, PLF export, and an owner's five-layout set for schedule reviews.
  17. 17FiltersDefault and custom filters in Oracle Primavera P6: All vs Any, replace vs highlight, rolling lookahead windows, and an owner's filter set.
  18. 18Grouping and sortingHow to group and sort activities in Oracle Primavera P6: the Group and Sort dialog, intervals, summaries, sort order and owner review views.
  19. 19Bars and Gantt formattingHow Gantt bars work in Oracle Primavera P6: timescales, filters, styles, labels and chart options, and the bar legend an owner should specify.
  20. 20Printing and publishingPrinting and publishing in Oracle Primavera P6: Page Setup, headers, revision boxes, PDF and HTML output, and an owner's standard print pack.

Photo: Isaac Smith on Unsplash (Unsplash Licence).