427 Special Operations Aviation Squadron hangar replacement
Options analysis; implementation from FY2027–28; delivery FY2032–33. Owner, value, builders and public source, tracked by Benjamin R. Consulting.
OwnerNational Defence
Value$250M–$499M (Defence Capabilities Blueprint range)
StatusOptions analysis; implementation from FY2027–28; delivery FY2032–33
What owners and contractors should watch
Air base projects mix secure, operational and airside work.
Expect facility security clearance requirements for bidders and their workers, airside access rules that slow deliveries and inspections, and long-lead items such as hangar doors, fuel systems and aircraft support equipment.
Build security screening time and airside phasing into the schedule from day one, and treat long-lead procurement as its own critical path.
Delivering defence work? Talk to us about schedule and cost control on DND projects →
Source: Defence Capabilities Blueprint · Updated October 27, 2026. Values and dates are as published by the owner or in the cited source. Benjamin R. Consulting is not involved in this project. Spotted an update? Tell us.
More air bases projects
Cold Lake, ABFighter Squadron Facility, 4 Wing Cold Lake$525M for the two squadron facilities (with Bagotville); nearly $4B more for fighter capability at Cold Lake (Oct 2026)Saguenay, QCFighter Squadron Facility, 3 Wing BagotvillePart of $525M for the two squadron facilitiesAll 31 projectsSee the Canada defence map →Air, NORAD and the North, naval, army and housing